business@unidrydocks.com
+86-631-796-3808
Home
About Us
Company Profile
Qualification Certificate
Infrastructure
Principal Facilities
Joint Workshop &Store
Supporting Services
Products and Services
Bulk Carrier
Container
Oil Tanker
Chemical Tanker
Ro-Ro & PCC
Refrigerating Vessel
Offshore Project
Conversion Project
Partners
Company News
Contact Us
A modern marine engineering base integrating ship maintenance, modification and manufacturing
Jan 13,2023
Xinhong Heavy Industry conducts specialized skills training for LNG ship repair.
To enhance the repair capabilities of LNG vessels and to further prepare for the development of high value-added markets.
READ MORE
Oct 31,2021
Xinhong Heavy Industries has completed repairs on the super-large vessel "Brazil Maru," setting a new historical record.
On October 29, the "Brazilian Ball" vessel successfully completed all repair and modification works at Xinhong Heavy Industry and set sail smoothly.
Jan 03,2021
Xinhong Heavy Industry efficiently completed the "Tiebian Wind Power 01" overhaul project.
On December 15, 2020, the "Tiejian Wind Power 01" vessel entered the factory for maintenance. This vessel is the fifth offshore engineering ship that our company has repaired this year.
Nov 16,2020
[Team Building] The Electromechanical Workshop Conducts Specialized Training on Comprehensive Management and Skill Enhancement
The training was conducted by Ren Chunian, the Deputy General Manager of Tianjin Xinhong Heavy Industry, with special invitation. Participants included Zhang Panlian, the Director of the Electromechanical Workshop, Deputy Directors Zhang Jingshan and Guo Chao, as well as personnel at the supervisor level and above from the workshop.
Aug 13,2020
Xinhong Heavy Industry has successfully completed the repair and modification project for the "Bilbao" vessel for MSC.
On August 13, the "Bilbao" vessel of MSC Shipping Company successfully completed all repair and modification tasks at Xinhong Heavy Industry and entered the trial navigation phase.
May 28,2020
Xinhong Heavy Industry has successfully completed the repair and modification project for MSC's "Mediterranean Paris" vessel.
The modification of the bulbous bow and the installation of the desulfurization system are key projects in the repair and modification of the vessel, and they are also important works for controlling the dry dock period.
May 18,2020
Seizing the opportunity during the warranty period | Xinhong Heavy Industry overhauls the VLCC "Atlantis"
On May 17, the "Atlantis" vessel completed all renovation and repair work at Xinhong Heavy Industry, slowly departed from the dock, and embarked on a new journey.
Apr 29,2020
Unite and Focus │ Xinhong Heavy Industry Strikes Again at Production Peak
Since entering April, Xinhong Heavy Industry has seen a significant increase in ship repairs. By the end of the month, more than 30 vessels have been repaired and completed.
Apr 25,2020
The 170,000-ton non-powered vessel "ROBERTO RIZZO" has safely docked for the first time at the Xinhong Heavy Industry Wharf.
The safe docking of the "Robert Rizzo" has won high praise from the shipowners present.